To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

What is the slope of any line parallel to the line 8x + 9y = 3 in the standard (x,y) coordinate plane?
Which of the allies suffered the greatest losses on D-Day
Why were people from Africa brought to Georgia?
What is 1997 from 2014????????????
How many miles can you get on one tank of gas if your tank holds 18 gallons and you get 22 miles per gallon?
what does etymology study?
what is the kingdom and phylum of a euglena protest?
Suppose you ride your bicycle to the library traveling at 0.5 km/min. It takes you 25 minutes to get to 1.3 the library. How far did you travel?
A tree was chopped down and cut up in a local forest.The tree changed in shape.What kind of change took place?A.chemical changeB.physical change C.phase changeD
What are abiotic factors of the enviroment lynx