A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Someone plz help me :(
n accounting machine operator wanted to divide a 65 minute job between two identical machines so that one machine would take one and a half times as long as the
what does CPCTC represent and when would you use it?
ASAP PLEASE HELP Which example from the text develops the idea that it remains a mystery as to how the Egyptians moved and stacked the stones they used to buil
hey can someone go answer my most recent question pls, a bot answered it so if u could that would be nice <3❆
How was stained glass used in a new way in the gothic era?.
When was the constitution ratified by 9 states.
According to Vonnegut, what does being American mean? Do you agree with Vonnegut when he says the burning of books is un-American? Why or why not?
which colonies remained under the control of Spain?
what is a definition of figuarive language​