hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

What was the original goal of the Framers when they met at Independence Hall?  How did that goal change?
What numbers add up to -5 and multiply to get -90
work out the parallelogram of base 6cm and height 8cm
one meter is approximately equal to 39.39 inches. about how many inches are in 5 meter
How to solve mufti step equations 6a+5a=-11
What is this answer?10y=360°
the blueprint for landscaping a yard has a scale of 1/2" to1 foot. if the blueprint is a rectangle 18 inches by 22 inches,what are the dimensions of the yard?
The length of Marshall's poster is 2 times its width. If the perimeter is 72 inches, what is the area of the poster?
A mountain climber camped at an elevation of 18,492 feet. the following day the climber descended 2,516 feet to another campsite. Type a numerical expression
what variables can affect the number of books sold by a door to door salesperson