In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

What were two reasons that america began to mobilize for war against the central powers war by 1917?
what is an example of environmental pressure
A bullet with mass 1.0kg and velocity 180 m/s is brought to rest in 0.02 s by a sandbag.assuming constant acceleration in the sandbag,how deep,in meters,did the
Chapter 9 of Frankenstein begins with this sentence: Nothing is more painful to the human mind than, after the feelings have been worked up by a quick successio
Which of the following is an example of aggressive driving? A: honking to protest another drivers actions B: driving at late hours even when you’re tired C: si
A generic protein that is 387 amino acid residues long will have a molecular weight (daltons) _______.
During what stage do you learn abstract thinking skills
How could the united states reconcile its subsequent takeover over cuba with the teller resolution?
2 - una es diferente choose the word that does not belong. january 11 8:00 am unlimited attempts remaining grade settings 116-119 flashcards vocabulary list voc
The area of a rectangle is 42 square inches. the length is 7 inches.what is the perimeter of the rectangle?