Variances are calculated by subtracting the actual cost from ____

Respuesta :

thert68
thert68 thert68
  • 02-09-2017
Budgeted cost is the answer as by having the budget plan to compare to, the business, government agency, or non-profit organization can make adjustments to its management of costs or future budgets. 
Answer Link

Otras preguntas

The management staff of a busy cafeteria have not been getting along well. to increase group cohesiveness, the general manager criticizes each of the other mana
( 2x )/( 7) = ( 12)/( 14)
how have rituals surrounding the spanish plaza influenced events known as proms.
The Long march by Peggy king
Penicillin is an antibiotic that was discovered in 1928. Today, many species of bacteria have acquired resistance to penicillin. This adaptation occurred as the
Write an equation in point slope form of the line that passes through the given points. Then write the equation in slope-intercept form (-9,7) (3,3)
In deep ecology, through what means is happiness gained
The Romans excelled in all of the following except a.engineering b.architecture c.sculpture d.oil on canvas
Why is a high-quality bond typically considered a lower-risk investment than a stock?
What political gains did African Americans hope to achieve after the passage of the thirteenth admendment, how did white southerners respond to these ideas